Overview
What Production Planning does
A plan built on infinite capacity is a wish list. Noblle schedules jobs against the machines, tools and people that can actually perform each operation.
When something slips, the effect on every downstream promise is visible immediately rather than at the end of the week.
Capabilities
Production Planning in detail
Each capability is part of one connected order-to-cash record, not a separate bolt-on.
Finite capacity scheduling
Operations are placed against resources that exist, with setup and changeover included.
Work centre load
See load by period and identify the constraint before it bites.
Drag and reschedule
Move a job and see the knock-on effect on every affected order date.
Late risk flags
Jobs at risk of missing a promise are highlighted while there is still time to act.
Floor reporting
Operators report start, pause and complete from a phone at the machine.
Where it lives
Part of the MRP module
Material requirements planning and production scheduling sized for SME job shops.
Manufacturing
More in Manufacturing
See Production Planning working on your own process
Noblle covers 27 capabilities across one order-to-cash model.