Noblle

Manufacturing

Schedules that survive contact with the floor

Plan against real work centre capacity, setup time and material arrival dates.

C/4 Intelligencev0.1.0
PK
Search enterprise workspace…⌘K
Command CentreCRMOrder AcceptanceProduction PlanningMRPSupply ChainDispatchFinanceHRAgent

PLANNING / Capacity

Work centre capacity

Week 36 · available vs booked
Turning cell (3 machines)112 hrs of 120 hrs · 93%
Milling cell (2 machines)62 hrs of 80 hrs · 78%
Grinding24 hrs of 40 hrs · 60%
Forming and press17 hrs of 40 hrs · 43%
Heat treat (batch)51 hrs of 56 hrs · 91%
Assembly and test39 hrs of 80 hrs · 49%
Noblle product interface screens for Manufacturing: Schedules that survive contact with the floor

Overview

What Production Planning does

A plan built on infinite capacity is a wish list. Noblle schedules jobs against the machines, tools and people that can actually perform each operation.

When something slips, the effect on every downstream promise is visible immediately rather than at the end of the week.

Capabilities

Production Planning in detail

Each capability is part of one connected order-to-cash record, not a separate bolt-on.

Finite capacity scheduling

Operations are placed against resources that exist, with setup and changeover included.

Work centre load

See load by period and identify the constraint before it bites.

Drag and reschedule

Move a job and see the knock-on effect on every affected order date.

Late risk flags

Jobs at risk of missing a promise are highlighted while there is still time to act.

Floor reporting

Operators report start, pause and complete from a phone at the machine.

Where it lives

Part of the MRP module

Material requirements planning and production scheduling sized for SME job shops.

See Production Planning working on your own process

Noblle covers 27 capabilities across one order-to-cash model.