Noblle

Foundations

Dashboard

Real-time operational overview of orders, jobs, materials and cash in one view.

C/4 Intelligencev0.1.0
PK
Search enterprise workspace…⌘K
Command CentreCRMOrder AcceptanceProduction PlanningMRPSupply ChainDispatchFinanceHRAgent

Dashboard / Overview

Operational overview

Live · updated 8:14 AM

Open orders

1286 today

Jobs on floor

342

Materials on order

$96.4k12%

Invoices outstanding

$212k3

Needs attention

4 items

SO-10492 Harbourline Eng.

Material short: Seal kit V-104

At risk

INV-10431 Metro Rail Pty

62 days overdue, $18,400

Overdue

JOB-2218 VMC Cell 2

2 days behind schedule

Late

PO-3312 Vantage Steel

ETA moved to 02 Sep

Watch

Work centre load

This week
CNC Turning92%
VMC Cell 278%
Grinding61%
Assembly54%

Late jobs, short materials and overdue invoices lead, not vanity totals.

Noblle product interface screens for Foundations: Dashboard

What it does

Dashboard in the order-to-cash flow

The Noblle Dashboard is the operational front page of the factory. It consolidates the order-to-cash pipeline, quotes in progress, accepted orders, jobs on the floor, materials on order and invoices outstanding, into one continuously updated view designed to be read in under a minute.

Most SME manufacturers assemble this picture manually: a spreadsheet from the office, a whiteboard on the floor, a WhatsApp thread with a supplier and a phone call to the bookkeeper. The Dashboard replaces that reconciliation work with a live model of the business that updates as work actually happens.

Every metric is traceable. Tapping a figure drills into the underlying orders, jobs or purchase lines, so a number is never a dead end, it is an entry point into the record that produced it.

Because Noblle is mobile-first, the Dashboard is built for a phone held on a factory floor first and a desktop second. Layout, tap targets and data density are tuned for glanceable decisions between machines, not for a seated analyst session.

At a glance

A single pane of glass for owner-operators.

  • Mobile-first interface for factory floor use
  • Operable through WhatsApp via Sentinel
  • Grounded in the causal ontology engine
  • Deployed in weeks, not months

Key capabilities

What you get with Dashboard

Order-to-cash pipeline view

See every order from enquiry to payment in one funnel, with ageing and bottleneck indicators at each stage.

Live production status

Job progress, work centre load and late-risk flags update as the floor reports work, without manual status meetings.

Exception-first design

The Dashboard leads with what needs attention, late jobs, short materials, overdue invoices, rather than vanity totals.

Role-based views

Owners, sales, planners and floor supervisors each see a view scoped to the decisions they actually make.

Drill-through traceability

Every tile links to source records, so any figure can be audited down to the order line or purchase receipt.

Daily digest to WhatsApp

Sentinel can deliver the same picture as a short WhatsApp brief, so the Dashboard does not need to be opened at all.

Platform fit

How Dashboard fits with the rest of Noblle

Noblle is one operational model, not a suite of disconnected apps. Each module writes into the same record of the factory.

Connects to

Order Acceptance

Accepted orders feed the pipeline and revenue tiles.

Connects to

MRP

Job and capacity signals populate production status and late-risk flags.

Connects to

Supply Chain

Inbound purchase status drives material shortage warnings.

Connects to

Sentinel (AI Agent)

Dashboard exceptions become proactive WhatsApp alerts.

Product gallery

Dashboard interface

Product screenshots to be inserted.

C/4 Intelligencev0.1.0
PK
Search enterprise workspace…⌘K
Command CentreCRMOrder AcceptanceProduction PlanningMRPSupply ChainDispatchFinanceHRAgent

Dashboard / Overview

Operational overview

Live · updated 8:14 AM

Open orders

1286 today

Jobs on floor

342

Materials on order

$96.4k12%

Invoices outstanding

$212k3

Needs attention

4 items

SO-10492 Harbourline Eng.

Material short: Seal kit V-104

At risk

INV-10431 Metro Rail Pty

62 days overdue, $18,400

Overdue

JOB-2218 VMC Cell 2

2 days behind schedule

Late

PO-3312 Vantage Steel

ETA moved to 02 Sep

Watch

Work centre load

This week
CNC Turning92%
VMC Cell 278%
Grinding61%
Assembly54%

Late jobs, short materials and overdue invoices lead, not vanity totals.

C/4 Intelligencev0.1.0
PK
Search enterprise workspace…⌘K
Command CentreCRMOrder AcceptanceProduction PlanningMRPSupply ChainDispatchFinanceHRAgent

Dashboard / Pipeline

Order-to-cash pipeline

$1.96M in play

Pipeline by stage

Quote in progress
14$412k
Accepted, not scheduled
9$286k
In production
34$1.02M
Waiting material
6$148k
Ready to dispatch
5$96k

Drill-down

Tap any stage to see its orders
RefCustomerStageValue
SO-10492Harbourline Eng.Waiting material$24,800
SO-10488Metro Rail PtyIn production$61,200
QT-2214Coastal AlloysQuote in progress$38,500
SO-10475Northfield CastingsReady to dispatch$19,400
C/4 Intelligencev0.1.0
PK
Search enterprise workspace…⌘K
Command CentreCRMOrder AcceptanceProduction PlanningMRPSupply ChainDispatchFinanceHRAgent

Today, Geelong

Open orders

128

+6 today

Jobs on floor

34

On plan

Overdue invoices

$212k

3 overdue

Material shorts

4

2 at risk

Needs attention

SO-10492 Harbourline Eng.

At risk

INV-10431 Metro Rail Pty

Overdue

JOB-2218 VMC Cell 2

Late
Built for a phone held on the factory floor

See Dashboard in action

We configure the demo to your production process, not a generic dataset.