What it does
MRP in the order-to-cash flow
Noblle MRP explodes accepted orders into material requirements and work centre load, then produces a schedule the floor can actually follow. It is built for discrete, made-to-order and made-to-spec production rather than high-volume repetitive lines.
Bills of materials, routings, setup and run times, and work centre calendars combine into a plan that respects finite capacity. When a rush order lands, the impact on existing commitments is visible before the order is promised.
Shortages are surfaced as actions, not reports: what to buy, how much, and by when to protect a due date. Purchase suggestions flow straight into Supply Chain.
Floor feedback closes the loop. Operators confirm progress from a phone, so the plan reflects what has been made rather than what was assumed at the start of the week.
At a glance
Materials, scheduling and capacity that reflect the real floor.
- Mobile-first interface for factory floor use
- Operable through WhatsApp via Sentinel
- Grounded in the causal ontology engine
- Deployed in weeks, not months
Key capabilities
What you get with MRP
Bill of materials and routing
Multi-level BOMs with revision control, operations, setup and run times per work centre.
Finite capacity scheduling
Schedules respect real work centre calendars, shifts and constraints instead of assuming infinite capacity.
Shortage-to-action
Material gaps become dated purchase suggestions tied to the job and due date they protect.
What-if rescheduling
Test the impact of a rush order or a machine outage before committing to a customer date.
Mobile job reporting
Operators start, pause and complete operations from a phone, keeping the plan honest.
Job costing
Actual material, labour and machine time roll up against the quoted price for real margin per job.
Platform fit
How MRP fits with the rest of Noblle
Noblle is one operational model, not a suite of disconnected apps. Each module writes into the same record of the factory.
Connects to
Order Acceptance
Accepted jobs arrive with BOM and due date attached.
Connects to
Supply Chain
Shortages become purchase requisitions and expected receipts.
Connects to
ML Forecaster
Forecast demand supports longer-lead-time purchasing decisions.
Product gallery
MRP interface
Product screenshots to be inserted.
C/4 Intelligencev0.1.0MRP / Demand explosion
Demand explosion
Source
SO-10492 — Harbourline Eng.
Due 12 Sep · Qty 24 off
Exploded requirements
C/4 Intelligencev0.1.0MRP / Shortage exceptions
Shortage exceptions
Exceptions show the job or customer order each shortage puts at risk, not just the material.
C/4 Intelligencev0.1.0MRP / Purchase suggestions
Dated purchase suggestions
Order-by dates are calculated from supplier lead time so parts arrive before the job needs them.
Explore the platform
Other Noblle modules
See MRP in action
We configure the demo to your production process, not a generic dataset.