MRP / Demand explosion

Demand explosion

SO-10492 · PN-10620

Source

SO-10492 — Harbourline Eng.

Due 12 Sep · Qty 24 off

Firm order

Exploded requirements

PN-10620 Valve body24Finished part
— PN-20001 EN8 bright bar 25mm12.0 kgPurchased
— PN-20002 Seal kit V-10424Purchased
— — PN-30011 O-ring 18mm48Purchased
— PN-20003 Cast body blank24Purchased
— — PN-30022 Fastener M6x2096Purchased
Noblle product interface screens for Manufacturing: MRP

What it does

MRP in the order-to-cash flow

Noblle MRP explodes accepted orders into material requirements and work centre load, then produces a schedule the floor can actually follow. It is built for discrete, made-to-order and made-to-spec production rather than high-volume repetitive lines.

Bills of materials, routings, setup and run times, and work centre calendars combine into a plan that respects finite capacity. When a rush order lands, the impact on existing commitments is visible before the order is promised.

Shortages are surfaced as actions, not reports: what to buy, how much, and by when to protect a due date. Purchase suggestions flow straight into Supply Chain.

Floor feedback closes the loop. Operators confirm progress from a phone, so the plan reflects what has been made rather than what was assumed at the start of the week.

At a glance

Materials, scheduling and capacity that reflect the real floor.

  • Mobile-first interface for factory floor use
  • Operable through WhatsApp via Sentinel
  • Grounded in the causal ontology engine
  • Deployed in weeks, not months

Key capabilities

What you get with MRP

Bill of materials and routing

Multi-level BOMs with revision control, operations, setup and run times per work centre.

Finite capacity scheduling

Schedules respect real work centre calendars, shifts and constraints instead of assuming infinite capacity.

Shortage-to-action

Material gaps become dated purchase suggestions tied to the job and due date they protect.

What-if rescheduling

Test the impact of a rush order or a machine outage before committing to a customer date.

Mobile job reporting

Operators start, pause and complete operations from a phone, keeping the plan honest.

Job costing

Actual material, labour and machine time roll up against the quoted price for real margin per job.

Platform fit

How MRP fits with the rest of Noblle

Noblle is one operational model, not a suite of disconnected apps. Each module writes into the same record of the factory.

Connects to

Order Acceptance

Accepted jobs arrive with BOM and due date attached.

Connects to

Supply Chain

Shortages become purchase requisitions and expected receipts.

Connects to

ML Forecaster

Forecast demand supports longer-lead-time purchasing decisions.

Product gallery

MRP interface

Product screenshots to be inserted.

C/4 Intelligencev0.1.0
PK
Search enterprise workspace…⌘K
Command CentreCRMOrder AcceptanceProduction PlanningMRPSupply ChainDispatchFinanceHRAgent

MRP / Demand explosion

Demand explosion

SO-10492 · PN-10620

Source

SO-10492 — Harbourline Eng.

Due 12 Sep · Qty 24 off

Firm order

Exploded requirements

PN-10620 Valve body24Finished part
— PN-20001 EN8 bright bar 25mm12.0 kgPurchased
— PN-20002 Seal kit V-10424Purchased
— — PN-30011 O-ring 18mm48Purchased
— PN-20003 Cast body blank24Purchased
— — PN-30022 Fastener M6x2096Purchased
C/4 Intelligencev0.1.0
PK
Search enterprise workspace…⌘K
Command CentreCRMOrder AcceptanceProduction PlanningMRPSupply ChainDispatchFinanceHRAgent

MRP / Shortage exceptions

Shortage exceptions

5 at risk
MaterialShortJobCustomerImpact
PN-20002 Seal kit V-10418SO-10492Harbourline Eng.At risk
PN-20003 Cast body blank8SO-10492Harbourline Eng.At risk
PN-40011 Brass insert M840SO-10415Metro Rail PtyWatch
PN-40012 Grease 500g6BN-4412Coastal AlloysWatch

Exceptions show the job or customer order each shortage puts at risk, not just the material.

C/4 Intelligencev0.1.0
PK
Search enterprise workspace…⌘K
Command CentreCRMOrder AcceptanceProduction PlanningMRPSupply ChainDispatchFinanceHRAgent

MRP / Purchase suggestions

Dated purchase suggestions

12 suggestions
MaterialQtySupplierOrder byProtects
PN-20002 Seal kit V-10424Vantage Seals30 AugSO-10492
PN-20003 Cast body blank8Northfield Castings31 AugSO-10492
PN-40011 Brass insert M840Coastal Alloys02 SepSO-10415
PN-50007 Motor 0.75kW6Drive Systems Ltd05 SepSO-10388
PN-30044 Label roll 100x5010Packline07 SepBN-4412

Order-by dates are calculated from supplier lead time so parts arrive before the job needs them.